2.1 MWInstalled capacity
1.58M kWhAnnual production
1,185 tCO₂ reduction
5.3yPayback

Project note

Gaziantep Tekstil Tesisi GES is a 2.1 MW On-Grid installation in the Gaziantep region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets 1.58M kWh annual production with high savings (≈%79) and measurable carbon reduction.

Components used

PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX