Skip to main content
Skip to content
‹ References2023 · Commercial
Hybrid + Battery

Eskişehir AVM Otopark + Çatı GES

Eskişehir · Turkey

Project credentials

2.6 MWInstalled capacity
1.95M kWhAnnual production
1,460 tCO₂ reduction
4.6yPayback

Project note

Eskişehir AVM Otopark + Çatı GES is a 2.6 MW Hybrid + Battery installation in the Eskişehir region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets 1.95M kWh annual production with high savings (≈%90) and measurable carbon reduction.

Components used

PanelsLongi Hi-MO 6 · 580W mono
InverterSungrow SG250HX
BatteryBYD Battery-Box Premium HVS

Tags

CommercialHybrid + BatteryEskişehir2.6 MWSavings %90
Request a similar project →