Skip to main content
Skip to content
Bodrum · Turkey

Project credentials

18,20 kWp / 24 kWhInstalled capacity
Annual production
0 tCO₂ reduction
Payback

Project note

Çiftçi GES is a 18,20 kWp / 24 kWh Depolamalı Sistem installation in the Bodrum region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.

Gallery

Tags

Depolamalı SistemBodrum18,20 kWp / 24 kWhSavings —
View all references →