On-Grid
Muğla · Turkey

Project credentials
74,7 kWpInstalled capacity
—Annual production
0 tCO₂ reduction
—Payback
Project note
Bodrum Mesken GES is a 74,7 kWp On-Grid installation in the Muğla region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.
Gallery

