Skip to main content
Skip to content
Muğla · Turkey

Project credentials

74,7 kWpInstalled capacity
Annual production
0 tCO₂ reduction
Payback

Project note

Bodrum Mesken GES is a 74,7 kWp On-Grid installation in the Muğla region. Consumption profile, roof/land use and operational continuity were evaluated together. The system targets — annual production with high savings (≈—) and measurable carbon reduction.

Gallery

Tags

On-GridMuğla74,7 kWpSavings —
View all references →